Preliminary
Customer Site Survey
This section includes the information gathered in a site survey. Before scheduling a TSR system installation, contact your sales representative and schedule a site preparedness survey.
NOTE This is a preliminary survey form. While you may fill out as much as possible prior to meeting with an Avici representative, the survey will not be finalized without a full onsite inspection with an Avici representative prior to shipping equipment.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Avici CSE Representative:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Contact at Installation Site:
|
(Fill out a form for each installation location and attach with this form.)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Interface type(s):
|
|
|
(Enter quantity of each.)
|
- OC-3c short reach (500 Km)
|
|
|
- OC-3c intermediate reach (15 Km)
|
|
|
- OC-12c short reach (500 m)
|
|
|
- OC-12c intermediate reach (15 Km)
|
|
|
- OC-48c short reach (2 Km)
|
|
|
|
|
|
|
- Gigabit Ethernet long reach
|
|
|
- Gigabit Ethernet short reach
|
|
|
Local Union or Certification:
|
|
|
|
Requirements of an Installer:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Power Requirements
|
|
|
Meets power requirements: Input power -0 to 48 Vdc nominal 5500 W max.
|
|
|
Will power cable leads approach the TSR system from above or below the planned location? _______________
|
|
|
Customer supplies power feeds and returns. Total of eight supply and eight return feeds, size determined by local code requirements.
|
|
|
Customer supplies ground wire (#6 AWG) for single point ground to facility ground.
|
Transport & Unpacking
|
|
|
Customer provides accessible loading dock location (Include hours of operation of the loading dock).
|
|
|
Do delivery, freight elevators, and access to receiving dock need to be scheduled with building management?
|
|
|
Name and contact number of person who can coordinate use of the receiving platform for delivery of TSR system?
|
|
|
Restrictions in truck size to be used for delivery:
|
|
|
Customer provides pallet jack, forklift or similar equipment for transporting the bay from the loading dock to the installation area.
|
|
|
Heights and widths of all hallways and doorways en route to the installation site exceed the required measurements of the bay.
- Height on installation dolly: 2191 mm (86.3 in.)
- Height on pallet (uncrated): 2337 mm (92 in.)
- Height without shipping pallet or dolly: 2178 mm (85.8 in.)
- Width on shipping pallet 1016 mm (40 in.)
- Width on installation dolly 813 mm (32 in.)
|
|
|
Note raised thresholds or obstructions en route to installation site:
__________________________________________________________________________________________
|
|
|
Determine slope of any ramps onto a raised floor or other area.
|
|
|
Note if floor surface en route to installation site is not smooth.
|
Floor Loading
|
|
|
Floor loading: fully loaded bay provides floor loading of 586 kg/m2 (120 lb/ft2) given minimum access aisles in front and behind.
|
|
|
Concrete floors must be a minimum of 6 inches thick, 3000 psi concrete for anchoring the bay. The drilled hole depth must be 4 in.
|
|
|
Raised floors require a pedestal. Measure the space below floor tiles. Select a pedestal size.
|
|
|
12 in. ___ 18 in. ___ Custom (provide measurement): ________________________________
|
Installation
|
|
|
Customer has determined location to install TSR system.
|
|
|
Installation provides sufficient room for TSR system including front and back aisles.
|
|
|
Is there fixed (bolted) equipment on either side of the TSR system? (If so, equipment may need to be temporarily moved to accommodate pedestal installation.): (yes/no) _________
|
|
|
For raised floor installations, location below installation site is free of cables and other equipment.
|
Environment
|
|
|
Meets cooling requirements: 4.93 kW/m2 (458 kW/ft.2) assuming 48 in. front and 24 in. rear aisles. Max dissipation per bay is 5500 W.
|
|
|
Meets temperature requirements: long term: 5° to 40°C (41° to 104°F) short term: -5° to 50°C (23° to 122°F)
|
|
|
Meets humidity requirements: long term: 5% - 85% R. H., short term: 0% - 90% R. H. for 96 hours max.
|
Fiber
|
|
|
What are the fiber optic transmit and receive levels of equipment that will connect to the TSR system? Please specify: _________________
|
|
|
Will fiber optic cable leads approach the TSR system from above or below the planned location? ______________
|
Please return the completed form to: Avici Systems Inc.
Client-Services (PSO)
101 Billerica Ave.
N. Billerica, MA 01862