Contents

Preface
Support Services
Overview
Safety Information
Compliance to Electrical and Safety Standards
Compliance to Environmental Regulations and Directives
Antistatic Precautions
TSR II Bay Dimensions, Weights and Floor Loading
TSR II System Configuration
TSR II Full Bay Configuration
TSR II Split Bay Configuration
TSR II Hardware Descriptions
TRS II Bay Components
Installation Task Overview
Preinstallation
Preinstallation Tools
Inspecting the Shipping Contents
Unpacking the TSR II System
Unpacking the Removable Breaker Interface Panel (BIP)
Moving the Bay
Transporting the Bay Up a Ramp to a Raised Floor
Using a Pallet Truck
Using Custom Dolly
Unloading the Bay from the Shipping Pallet
Removing the Subassemblies
EMI Cover Removal
Removing the Front Air Plenum Assembly and Cooling Modules
Removing the Bay Controller Backplane Cover
Using Custom Dolly to Remove Bay from Shipping Pallet
Removing Vertical Doors
Using Custom Dolly
Installing the Front Dolly
Installing the Rear Dolly
Removing the Shipping Pallet
Placing and Anchoring Bays
Anchoring the TSR II Bay
Anchoring Tools Required
Floor Anchoring Procedures
Raised Floor Load Capacity
Pedestal Sizes
Anchoring to a Concrete Floor
Locating the Anchor Holes
Anchoring the Bay on a Concrete Floor
Anchoring to a Raised Floor With a Pedestal
Measuring and Cutting Raised Floor Tiles
Drilling Holes in the Concrete Subflooring
Anchoring the Pedestal
Anchoring the Bay to the Pedestal
Anchoring to a Raised Floor Without Pedestal
Locating the Anchor Holes
Installing Anchors and Threaded Rod
Anchoring the Bay to a Raised Floor
Installing TSR II Bay Components
Tools Needed
TSR II Bay Grounding Requirements
Installing the Removable BIP
Power Requirements
Power Input for BIP
Installing Power and Return Feeds to the BIP
Reinstalling the Subassemblies
Reinstalling the Vertical Doors
Reinstalling Lower Cable Guide Assemblies
Installing the Bay Controllers
Reinstalling the Cooling Modules
Reinstalling the Front Air Plenum Assembly and Grille
Reinstalling the Bay Controller Protective Cover
Module Population Rules
Preparing to Install Router and Route Controller Modules
Installing the Antistatic Wrist Strap
Bay Numbering
TSR II Bay Shelf and Slot Numbering
Router Module Population
Router Module Population Rules - Single Bay
Populating the TSR II Split Bay
Removing Filler Modules
Removing Filler Modules
Installing or Removing Router Modules
Installing or Removing Route Controller Modules
Installation Checklist
Installing System Cables
Customer Supplied Cables
Avici Supplied Cables
Ethernet Cable Specifications
Fiber Cable Routing
Fiber Management Frames
Installing Module Cables
Installing Route Controller Module Cables
TSR II:RS-232 Serial Interface Connector
Installing Bay Controller Backplane Cables
Ethernet Cables
Bay Numbering
Grounding Communication Links
Central Office Alarms
CO Alarm Levels
CO Alarm LEDs and Audible Bells
Installing Central Office Alarm Cables
Configuring Central Office Alarm Cable Connections
Reinstalling EMI Covers
Route Controller Module POST
Route Controller Module LEDs
Restarting a Route Controller Module
Router Module POST
Router Module LEDs
Restarting a Routing Module
Bay Controller POST
Bay Controller LEDs
Restarting a Bay Controller Module
Installing the Bay Controller
Cooling Module LEDs
Installing Filler Modules
Fiber Cleaning
Ground Connections
Power Connections
Replacing the Front and Rear Air Filters
Cooling Modules
Filler Modules
Index


Copyright © 2006 Avici Systems Inc.
Avici® and TSR® is a registered trademark of Avici Systems Inc.
IPriori™, Composite Links™, SSR™, QSR, and NSR™ are trademarks of Avici Systems Inc.

   Source File Name: 03801-00_revIATOC.fm
    HTML File Name: toc.html
    Last Updated: 12/08/06 at 10:47:54

Please email suggestions and comments to: doc@avici.com