Contents
Preface
About This Document Intended Audience Document Organization Related Information What You Need to Know Support Services
- Notational Conventions
Overview
Safety Information
- Compliance to Electrical and Safety Standards
- Antistatic Precautions
- TSR Bay Dimensions, Weights, and Floor Loading
TSR Hardware
- TSR Full Bay Configuration
Hardware Descriptions Bay Components
- Router Modules
- Server Modules
- Cooling Assembly
- Bay Shelf Cover
- Installation
Preinstallation
Preinstallation Tools
- Inspecting the Shipping Contents
- Unpacking the TSR System
- Moving the Bay
Transporting the Bay Up a Ramp to a Raised Floor
- Using a Pallet Truck
- Using the Custom Dolly
Unloading the Bay
- Removing the Front Air Intake Assembly
- Removing Short Vertical Cable Doors
- Removing the Cooling Module
- Removing the Baseplate
- Removing the Rear Air Intake Assembly
- Loading the Bay Onto the Custom Dolly
- Using the Custom Dolly
- Removing the Shipping Pallet
Placing and Anchoring Bays
Anchoring the TSR Bay Anchoring Methods Anchoring Tools Required Floor Anchoring Procedure
- Raised Floor Load Capacity
- Pedestal Sizes
Anchoring to a Concrete Floor
- Locating the Anchor Holes
- Anchoring the Bay on a Concrete Floor
Anchoring to a Raised Floor With a Pedestal
- Measuring and Cutting Raised Floor Tiles
- Drilling Holes in the Concrete Subflooring
- Anchoring the Pedestal
- Anchoring the Bay to the Pedestal
Anchoring to a Raised Floor Without Pedestal
- Locating the Anchor Holes
- Installing Anchors and Threaded Rod
- Anchoring the Bay on the Raised Floor
Installing TSR Bay Components
Tools Needed Removing the Top Rear Panel Grounding Requirements
- Installing Safety Ground to the TSR Bay
Power Requirements
- Power Input
- Installing Power and Return Feeds to the TSR Bay
Installing the Cooling Assembly
- Installing the Baseplate
- Reinstalling the Short Vertical Doors
- Installing the Bay Controller
- Installing the Cooling Modules
- Installing the Front Air Intake Assembly
Removing Shelf Covers TSR Bay Module Population Rules
- TSR Bay Shelf and Slot Numbering
- Module Orientation
- Populating The First Bay
Preparing to Install Modules
- Installing the Antistatic Wrist Strap
Installing Router Modules
- Removing Filler Modules
- Installing Router Modules
- Installing Server Modules
Installing System Cables
Customer Supplied Cables Avici Supplied Cables Ethernet Cable Specifications Fiber Cable Routing Fiber Management Frames Installing Module Cables
- Installing Server Module Cables
- Redundant Bay Controllers
- TSR Full Bay Configuration
Installing Router Module Cables
- Installing Router Fiber Optic Cables
- RS-232 Serial Interface Connector
- Installing Bay Controller Backplane Cables
- Ethernet Cables
- Bay Numbering
- Rotary and Toggle Switch Settings
Grounding Communication Links Central Office Alarms
- CO Alarm Levels
- CO Alarm LEDs and Audible Bells
- Installing Central Office Alarm Cables
- Configuring Central Office Alarm Cable Connections
- Installing the Shelf Cover
Installing Bay Panels
Tools Needed Installing the TSR Bay Side Panels Installing the TSR Bay Rear Panels POST and Troubleshooting
Server Module POST
- Server Module LEDs
- Restarting a Server Module
Router Module POST
- Router Module LEDs
- Restarting a Routing Module
Bay Controller POST
- Bay Controller LEDs
- Restarting a Bay Controller Module
- Installing the Bay Controller
Cooling Module LEDs Installing Filler Modules Routine Maintenance
Fiber Cleaning Ground Connections Power Connections Cleaning and Replacing the Air Filters
- Cooling Modules
- Filler Modules
Index
|